03 March 2015

State of Mission Report February 2015...and "Tunnels Complete"! ~ Cobra ~ 2 March 2015


This is the report for February (here for link):
Pandora in progres, MOSS in progress, TUNNELS in final completion. PB breach continuation, drastic systems/PPN/Isidic security breach, deflected. HVBN substable to stable. M=10. 

It was followed by this (here for link):
TUNNELS complete.

That's another major milestone success!!!!

To remind us again what "Tunnels" refer to, this is Cobra's description:
"There are quantum singularity wormholes within the plasmatic plane and in the occult terminology they are called the Tunnels of Set. Those wormholes contain strangelet and toplet bombs and they are tied to the physical Black Stone in the Long Island location. This is the main reason why clearing of the plasma scalar network and the Veil is taking so long."

"Tunnels of Set, plasmatic fistulae of disgust, are being cracked open by the Light, the infection oozing out, being transformed by the Light and being absorbed into the One. This is the occult reason for craziness happening on this planet right now..."

No comments:

Post a Comment